Resources

 

We’ve compiled a series of resources to help keep you updated on the latest reports and actions surrounding the Anniston site. Scroll down to browse and download any information you may need.

2020 Annual Groundwater Detection Monitoring and Corrective Action Effectiveness Report

2020

Download
2021 annual groundwater detection monitoring and corrective action effectiveness report

2021

Download
2022 annual groundwater detection monitoring and corrective action effectiveness report

2022

Download
2023 annual groundwater detection monitoring and corrective action effectiveness report

2023

Download
A02 - Dredge spoil area evaluation report

1998

Download
A03 - Dredge spoil area RFICS phase 1

1999

Download
A03 - Interim measures work plan Monsanto - Anniston facility

1997

Download
A04 - Corrective measures study

2000

Download
A04 - IMWP approval correspondence

1997

Download
A05 - IM report

1998

Download
A05 - RFI results and IM plan

2000

Download
A06 - Final design drawings for IM

1998

Download
A06 - IM plan softball fields

2001

Download
A07 - Excavated stockpiled soil removal action work plan

2001

Download
A07 - Revised supplemental IMWP

1998

Download
A08 - Corrective measures report softball complex

2001

Download
A08 - Final report for DCC project - Optimized

1998

Download
A09 - Construction drawings NS and misc prop closure design

1998

Download
A09 - Prime properties soil sampling

2001

Download
A10 - Prime properties cover material sampling

2001

Download
A10 - Soil excavation and placement correspondence

1998

Download
A11 - RCRA facility investigation results and IM plan

2002

Download
A11 - Review of soil excavation letter

1998

Download
A12 - Excavated soil stockpile corrective measures study

2002

Download
A12 - NS IM design revisions

1998

Download
A13 - Corrective measures study approval

2002

Download
A13 - Response to comments and revised text of RSIMWP

1998

Download
A14 - Notice of approval of Rev 2 RSIMWP

1998

Download
A14 - Softball Parking Lot IM Report

2002

Download
A15 - BMP plan construction of soil cap

2002

Download
A15 - Dredge spoil area evaluation report

1998

Download
A16 - ADEM authorization Oxford lake park

2002

Download
A16 - Supplemental IM report

1999

Download
A17 - Dredge spoil area RFICS phase 1

1999

Download
A17 - Excavated stockpiled soil corrective measures implementation work plan

2003

Download
A18 - Extension of north side cover

1999

Download
A18 - Tennis court IM report

2003

Download
A19 - NOD extension of NS cover

1999

Download
A20 - Revised NOD for extension of NS cover

1999

Download
A20 - Softball complex IM report

2004

Download
A21 - Highway phase 1 completion report

2004

Download
A21 - Revised IMWP for extension of NS cover

2000

Download
A22 - Final corrective measures implementation plan report

2007

Download
A22 - Ice house property cover material soil sampling memo

2000

Download
A23 - NS Cover extension IM report

2002

Download
A23 - Phase I/phase II construction interim remedial measures report

2008

Download
A24 - NS Cover extension IM report addendum

2004

Download
A25 - CSSMA O&C plan

2004

Download
A25 - West abutmen sampling data

2011

Download
A26 - Hall St final cap and cover drawing - Exhibit B

2005

Download
A26 - Utility construction completion report

2011

Download
A27 - 11th steet ditch completion report

2005

Download
A27 - Softball complex lightning and drainage upgrades

2012

Download
A28 - 11th street ditch final O&M plan

2005

Download
A28 - Dredge spoil evaluation report

2012

Download
A29 - Former holiday inn redevelopment completion report

2013

Download
A29 - Hall St boundary survey drawing - Exhibit A

2006

Download
A30 - O&M plan for action projects

2014

Download
A30a - CSSMA final closure report

2006

Download
A30b - CSSMA final closure report

2006

Download
A30c - CSSMA final closure report

2006

Download
A30d - CSSMA final closure report

2006

Download
A30e - CSSMA final closure report

2006

Download
A31 - Hall St final cap&cover drawing

2007

Download
A31 - Miracle field construction completion report

2014

Download
A32 - Hall St properties deed restriction

2007

Download
A32 - Remedial measures completion report

2014

Download
A33 - Maintenance building completion report

2017

Download
A33 - Snow Creek sediment removal action completion report

2010

Download
A34 - Former Mars Hill Church IM cover design details

2012

Download
A34 - Proposed dewatering facility construction support work plan

2018

Download
A35 - Snow Creek Dredge spoil removal - 710 Pine St

2012

Download
A36 - Dredge spoil evaluation report

2012

Download
A37 - Former Mars Hill Church post demo supplemental IM completion report

2013

Download
A38 - Quintard Mall IM report

2013

Download
A39 - Comprehensive O&M plan

2014

Download
Appendix A - Alternative removal action workplan

2013

Download
Appendix B - Remedial areas using a nonresidential soil PRG of 9 mglkg

2013

Download
Appendix C - Fish consumption survey results

2009

Download
Appendix C - Remedial areas using a sediment PRG of 1 mglkg

2016

Download
Appendix D - Conceptual soil management plan

2016

Download
Appendix D - OU-4 fish collection data report

2009

Download
Appendix E - Choccolocco creek intensive water quality and biological study

1997

Download
Appendix E - Cost estimate tables for a nonresidential soil PRG of 9 mglkg

2000

Download
Appendix E1 - Field data sheets and field notes

2005

Download
Appendix E1 - Figures

2005

Download
Appendix E1 - Tables 1 and 2

2005

Download
Appendix E2 - Cover letter

2013

Download
Appendix E2 - OU1 OU2 SERA Dec 2013

2013

Download
Appendix E2 - OU1 OU2 SERA Dec 2013 - Text tables figures appendices

2013

Download
Appendix E3 - Anniston PCB Site - Revision 1 of the screening level

2014

Download
Appendix F - Chemistry data report for sediment and bioaccumulating testing

2011

Download
Appendix F - Cost estimate tables for a sediment

2000

Download
Appendix F - Report template with numbered headings

2014

Download
Appendix G - CPOCs other than PCBs

2003

Download
Appendix G - OU-4 phase 1 ecological survey report

2007

Download
Appendix H - OU-4 sediment stability technical memo

2010

Download
Appendix H - State of AL indirect discharge permit application data

Download
Appendix I - Anniston integrated HHRA

2013

Download
Appendix J1 - BERA transmittal letter

2016

Download
Appendix J2 - Anniston PBC site BERA volume I

2016

Download
Appendix J3 - Anniston PBC Site BERA Volume II

2016

Download
Appendix J6 - OU-4 responses to USEPA's comments on the OU-4 BERA

2016

Download
Appendix K1 - BERA addendum approval

2018

Download
Appendix K2 - BERA addendum

2019

Download
April cumulative report 2007

2007

Download
April progress report 2001

2001

Download
April progress report 2002

2002

Download
April progress report 2003

2003

Download
April progress report 2004

2004

Download
April progress report 2005

2005

Download
April progress report 2006

2006

Download
April progress report 2007

2007

Download
April progress report 2008

2008

Download
April progress report 2009

2009

Download
April progress report 2010

2010

Download
April progress report 2011

2011

Download
April progress report 2012

2012

Download
April progress report 2013

2013

Download
April progress report 2014

2014

Download
April progress report 2015

2015

Download
April progress report 2016

2016

Download
April progress report 2017

2017

Download
April progress report 2018

2018

Download
April progress report 2019

2019

Download
April progress report 2020

2020

Download
April progress report 2021

2021

Download
April progress report 2022

2022

Download
April progress report 2023

2023

Download
April progress report 2024

2024

Download
April progress report 2025

2025

Download
August progress report 2001

2001

Download
August progress report 2002

2002

Download
August progress report 2003

2003

Download
August progress report 2004

2004

Download
August progress report 2005

2005

Download
August progress report 2006

2006

Download
August progress report 2007

2007

Download
August progress report 2008

2008

Download
August progress report 2009

2009

Download
August progress report 2010

2010

Download
August progress report 2011

2011

Download
August progress report 2012

2012

Download
August progress report 2013

2013

Download
August progress report 2014

2014

Download
August progress report 2015

2015

Download
August progress report 2017

2017

Download
August progress report 2018

2018

Download
August progress report 2019

2019

Download
August progress report 2020

2020

Download
August progress report 2021

2021

Download
August progress report 2022

2022

Download
August progress report 2023

2023

Download
August progress report 2024

2024

Download
August progress report 2025

2025

Download
December cumulative report 2005

2005

Download
December cumulative report 2006

2006

Download
December progress report 2001

2001

Download
December progress report 2002

2002

Download
December progress report 2003

2003

Download
December progress report 2004

2004

Download
December progress report 2005

2005

Download
December progress report 2006

2006

Download
December progress report 2007

2007

Download
December progress report 2008

2008

Download
December progress report 2009

2009

Download
December progress report 2010

2010

Download
December progress report 2011

2011

Download
December progress report 2012

2012

Download
December progress report 2013

2013

Download
December progress report 2014

2014

Download
December progress report 2015

2015

Download
December progress report 2015

2016

Download
December progress report 2017

2017

Download
December progress report 2018

2018

Download
December progress report 2019

2019

Download
December progress report 2020

2020

Download
December progress report 2021

2021

Download
December progress report 2022

2022

Download
December progress report 2023

2023

Download
December progress report 2024

2024

Download
February progress report 2002

2002

Download
February progress report 2003

2003

Download
February progress report 2004

2004

Download
February progress report 2005

2005

Download
February progress report 2006

2006

Download
February progress report 2007

2007

Download
February progress report 2008

2008

Download
February progress report 2009

2009

Download
February progress report 2010

2010

Download
February progress report 2011

2011

Download
February progress report 2012

2012

Download
February progress report 2013

2013

Download
February progress report 2014

2014

Download
February progress report 2015

2015

Download
February progress report 2016

2016

Download
February progress report 2017

2017

Download
February progress report 2018

2018

Download
February progress report 2019

2019

Download
February progress report 2020

2020

Download
February progress report 2021

2021

Download
February progress report 2022

2022

Download
February progress report 2023

2023

Download
February progress report 2024

2024

Download
February progress report 2025

2025

Download
Final annual progress report 2004

2004

Download
January progress report 2002

2002

Download
January progress report 2003

2003

Download
January progress report 2004

2004

Download
January progress report 2005

2005

Download
January progress report 2006

2006

Download
January progress report 2007

2007

Download
January progress report 2008

2008

Download
January progress report 2009

2009

Download
January progress report 2010

2010

Download
January progress report 2011

2011

Download
January progress report 2012

2012

Download
January progress report 2013

2013

Download
January progress report 2014

2014

Download
January progress report 2015

2015

Download
January progress report 2016

2016

Download
January progress report 2017

2017

Download
January progress report 2018

2018

Download
January progress report 2019

2019

Download
January progress report 2020

2020

Download
January progress report 2021

2021

Download
January progress report 2022

2022

Download
January progress report 2023

2023

Download
January progress report 2024

2024

Download
January progress report 2025

2025

Download
July progress report 2001

2001

Download
July progress report 2002

2002

Download
July progress report 2003

2003

Download
July progress report 2004

2004

Download
July progress report 2005

2005

Download
July progress report 2006

2006

Download
July progress report 2007

2007

Download
July progress report 2008

2008

Download
July progress report 2009

2009

Download
July progress report 2011

2011

Download
July progress report 2012

2012

Download
July progress report 2013

2013

Download
July progress report 2014

2014

Download
July progress report 2015

2015

Download
July progress report 2016

2016

Download
July progress report 2018

2018

Download
July progress report 2019

2019

Download
July progress report 2020

2020

Download
July progress report 2021

2021

Download
July progress report 2022

2022

Download
July progress report 2023

2023

Download
July progress report 2024

2024

Download
July progress report 2025

2025

Download
June cumulative report 2005

2005

Download
June cumulative report 2006

2006

Download
June cumulative report 2007

2007

Download
June progress report 2001

2001

Download
June progress report 2002

2002

Download
June progress report 2003

2003

Download
June progress report 2004

2004

Download
June progress report 2005

2005

Download
June progress report 2006

2006

Download
June progress report 2007

2007

Download
June progress report 2008

2008

Download
June progress report 2009

2009

Download
June progress report 2010

2010

Download
June progress report 2011

2011

Download
June progress report 2012

2012

Download
June progress report 2013

2013

Download
June progress report 2014

2014

Download
June progress report 2015

2015

Download
June progress report 2016

2016

Download
June progress report 2017

2017

Download
June progress report 2018

2018

Download
June progress report 2019

2019

Download
June progress report 2020

2020

Download
June progress report 2021

2021

Download
June progress report 2022

2022

Download
June progress report 2023

2023

Download
June progress report 2024

2024

Download
June progress report 2025

2025

Download
March cumulative report 2005

2005

Download
March cumulative report 2006

2006

Download
March progress report 2001

2001

Download
March progress report 2002

2002

Download
March progress report 2003

2003

Download
March progress report 2004

2004

Download
March progress report 2005

2005

Download
March progress report 2006

2006

Download
March progress report 2007

2007

Download
March progress report 2008

2008

Download
March progress report 2009

2009

Download
March progress report 2010

2010

Download
March progress report 2011

2011

Download
March progress report 2012

2012

Download
March progress report 2013

2013

Download
March progress report 2014

2014

Download
March progress report 2015

2015

Download
March progress report 2016

2016

Download
March progress report 2017

2017

Download
March progress report 2018

2018

Download
March progress report 2019

2019

Download
March progress report 2020

2020

Download
March progress report 2021

2021

Download
March progress report 2022

2022

Download
March progress report 2023

2023

Download
March progress report 2024

2024

Download
March progress report 2025

2025

Download
May progress report 2001

2001

Download
May progress report 2002

2002

Download
May progress report 2003

2003

Download
May progress report 2004

2004

Download
May progress report 2005

2005

Download
May progress report 2006

2006

Download
May progress report 2007

2007

Download
May progress report 2008

2008

Download
May progress report 2009

2009

Download
May progress report 2010

2010

Download
May progress report 2011

2011

Download
May progress report 2012

2012

Download
May progress report 2013

2013

Download
May progress report 2014

2014

Download
May progress report 2015

2015

Download
May progress report 2016

2016

Download
May progress report 2017

2017

Download
May progress report 2018

2018

Download
May progress report 2019

2019

Download
May progress report 2020

2020

Download
May progress report 2021

2021

Download
May progress report 2022

2022

Download
May progress report 2023

2023

Download
May progress report 2024

2024

Download
May progress report 2025

2025

Download
Non-remedial action completion report

2018

Download
November progress report 2001

2001

Download
November progress report 2002

2002

Download
November progress report 2003

2003

Download
November progress report 2004

2004

Download
November progress report 2005

2005

Download
November progress report 2006

2006

Download
November progress report 2007

2007

Download
November progress report 2008

2008

Download
November progress report 2009

2009

Download
November progress report 2010

2010

Download
November progress report 2011

2011

Download
November progress report 2012

2012

Download
November progress report 2013

2013

Download
November progress report 2014

2014

Download
November progress report 2015

2015

Download
November progress report 2016

2016

Download
November progress report 2017

2017

Download
November progress report 2018

2018

Download
November progress report 2019

2019

Download
November progress report 2020

2020

Download
November progress report 2021

2021

Download
November progress report 2023

2023

Download
November progress report 2024

2024

Download
OU-1/OU-2 Pre-Design Investigation Work Plan

2022

Download
OU-1/OU-2 Responses to EPA's Comments on the OU-1/OU-2 Feasibility Study

2016

Download
OU-1/OU-2 consent decree

2021

Download
OU-1/OU-2 feasibility study

2016

Download
OU-1/OU-2 feasibility study cover letter

2016

Download
OU-1/OU-2 pre-design investigation work plan EPA approval letter

2022

Download
OU-1/OU-2 pre-design investigation work plan cover letter

2022

Download
OU-1/OU-2 record of decision

2017

Download
OU-1/OU-2 remedial design work plan

2021

Download
OU-1/OU-2 remedial design work plan approval letter

2021

Download
OU-1/OU-2 remedial design work plan transmittal letter

2021

Download
OU-1/OU-2 remedial investigation

2015

Download
OU-1/OU-2 responses to EPA's comment on the pre-design work plan

2022

Download
OU-1/OU-2 responses to EPA's comments on the OU-1/OU-2 remedial design work plan

2021

Download
OU-3 Remedial Action Construction Completion Report

2017

Download
OU-3 Remedial Action Construction Completion Report 2nd Addendum

2021

Download
OU-3 Remedial Action Construction Completion Report Addendum

2018

Download
OU-3 consent cecree

2012

Download
OU-3 feasibility study report

2010

Download
OU-3 human health risk assessment

2008

Download
OU-3 interim record of decision

2011

Download
OU-3 remedial investigation addendum area a removal action

2010

Download
OU-3 remedial investigation addendum south landfill cap assessment and west landfill confirmation sampling

2010

Download
OU-3 remedial investigation report vol 1

2010

Download
OU-3 remedial investigation report vol 2

2010

Download
OU-4 FS RTC

2023

Download
OU-4 FS transmittal letter

2023

Download
OU-4 Feasibility Study

2023

Download
OU-4 RI approval

2019

Download
OU-4 RI cover letter

2019

Download
OU-4 Record of Decision - Logan Martin Lake

2024

Download
OU-4 Remedial Investigation

2019

Download
OU-4 feasibility study

2024

Download
OU-4 feasibility study addendum

2024

Download
OU-4 proposed plan

2024

Download
OU-4 proposed plan response to comments

2024

Download
OU-4 record of decision - Choccolocco creek

2024

Download
OU-4 remedial investigation responses to comments

2019

Download
October 2000 through February 2001 progress report

2001

Download
October progress report 2001

2001

Download
October progress report 2002

2002

Download
October progress report 2003

2003

Download
October progress report 2004

2004

Download
October progress report 2005

2005

Download
October progress report 2006

2006

Download
October progress report 2007

2007

Download
October progress report 2008

2008

Download
October progress report 2009

2009

Download
October progress report 2010

2010

Download
October progress report 2011

2011

Download
October progress report 2012

2012

Download
October progress report 2013

2013

Download
October progress report 2014

2014

Download
October progress report 2015

2015

Download
October progress report 2017

2017

Download
October progress report 2018

2018

Download
October progress report 2019

2019

Download
October progress report 2020

2020

Download
October progress report 2021

2021

Download
October progress report 2022

2022

Download
October progress report 2023

2023

Download
October progress report 2024

2024

Download
Off-site RCRA facility investigation (RFI) Report - Volume 1 of 4

2000

Download
Off-site RCRA facility investigation (RFI) report

2000

Download
Off-site RCRA facility investigation (RFI) report - Volume 4

2000

Download
Off-site RFI report - appendices vol 2 (appendix a, part 2)

2000

Download
Off-site RFI report - appendices vol 3 (appendices b, c, d)

2000

Download
Onsite RFI/CS report for the Anniston Alabama facility

2002

Download
Partial consent decree 2002

2002

Download
Partial consent decree 2002 Anniston

2002

Download
Partial consent decree 2002 Choccolocco

2002

Download
Partial consent decree 2002 Sitewide

2002

Download
Progress report 2002 - 2003

2002

Download
Progress report 2003 - 2004

2004

Download
Q1 report 2005

2005

Download
Q1 report 2006

2006

Download
Q1 report 2007

2007

Download
Q1 report 2008

2008

Download
Q2 report 2007

2007

Download
Q2 report 2008

2008

Download
Q4 report 2005

2005

Download
Q4 report 2006

2006

Download
Q4 report 2008

2008

Download
Responses to ADEM Comments on the June 2000 Phase I RFI/CS Investigation Report

2000

Download
Screening level ecological risk assessment - Anniston plant

2005

Download
Screening level ecological risk assessment - Residential and non residential

2005

Download
Second five-year review report for Anniston PCB sIte

2025

Download
September cumulative report 2005

2005

Download
September cumulative report 2006

2006

Download
September cumulative report 2007

2007

Download
September progress report 2001

2001

Download
September progress report 2002

2002

Download
September progress report 2003

2003

Download
September progress report 2004

2004

Download
September progress report 2005

2005

Download
September progress report 2006

2006

Download
September progress report 2007

2007

Download
September progress report 2008

2008

Download
September progress report 2009

2009

Download
September progress report 2010

2010

Download
September progress report 2011

2011

Download
September progress report 2012

2012

Download
September progress report 2013

2013

Download
September progress report 2014

2014

Download
September progress report 2015

2015

Download
September progress report 2017

2017

Download
September progress report 2018

2018

Download
September progress report 2019

2019

Download
September progress report 2020

2020

Download
September progress report 2021

2021

Download
September progress report 2022

2022

Download
September progress report 2023

2023

Download
September progress report 2024

2024

Download
Supplemental Work Plan for the Off-Site Portion of the RFI/CS Program

1999

Download